Perovo Solar Park
The Perovo Solar Park is a 100 MWp photovoltaic power station located at Perovo, Simferopol Raion, Crimea. As of July 2012 it is the world's fourth-largest solar farm, and is made up of 440,000 solar panels. It is owned by Activ Solar, and the final 20 MW stage was completed on December 29, 2011.
| Perovo Solar Park | |
|---|---|
![]() | |
| |
| Country | Disputed: |
| Location | Perovo, Crimea |
| Coordinates | 44°54′N 33°56′E |
| Status | Operational |
| Solar farm | |
| Type | Flat-panel PV |
| Site area | 200 ha (494 acres) 200 ha (2 km2) |
| Power generation | |
| Units operational | 440,000 |
| Nameplate capacity | 100 MW |
| Annual net output | 132.5 GWh[1] |
In 2009, Ukraine established a feed-in tariff of €0.46 per kilowatt hour until 2030, one of the highest.[2]
References