Chengzhui line
The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railways Administration connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. It is currently a single-track railway. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communication, the line is currently being upgraded to a double-track to allow for increased traffic between downtown Taichung and its coastal towns. The construction was completed in 2020.[1][2][3]
| Chengzhui Line | |
|---|---|
| Overview | |
| Native name | 成追線 |
| Owner | Taiwan Railways Administration |
| Termini | Chenggong Zhuifen |
| Stations | 2 |
| History | |
| Opened | 11 October 1922 |
| Technical | |
| Line length | 2.2 km (1.4 mi) |
| Track gauge | 1,067 mm (3 ft 6 in) |
| Electrification | Entire line, 25 kV |
Currently, only local services run through the Chengzhui Line.[4]
Stations
| Name | Chinese | Taiwanese | Hakka | Transfers and Notes | Location | |
|---|---|---|---|---|---|---|
| Chenggong | 成功 | Sêng-kong | Sṳ̀n-kûng | → |
Wuri | Taichung City |
| Zhuifen | 追分 | Tui-hun | Tûi-fûn | → |
Dadu | |
References
- "成功到追分鐵路雙軌化 中央全數補助". 自由時報. Retrieved 7 January 2019.
- "破除謠言 中市府:山手線已動工、成追線雙軌明年完成". 新頭殼. Retrieved 7 January 2019.
- "台鐵成追線雙軌化 首航列車明10:20成功站開出". 自由時報. Retrieved 2 January 2020.
- "成追線火車時刻表". 臺灣鐵路管理局. Retrieved 7 January 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
