Line 28 (Beijing Subway)
Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a planned rapid transit line in Beijing. It was formerly known as CBD line.
| Line 28 | |
|---|---|
| 28 | |
| Overview | |
| Other name(s) | M28 (planned name) CBD line |
| Status | Planned[1] |
| Locale | Chaoyang district Beijing |
| Termini | Dongdaqiao Guangqudonglu |
| Stations | 9 |
| Service | |
| Type | Rapid Transit |
| System | Beijing Subway |
| Rolling stock | 6-car Type LB |
| Technical | |
| Line length | 8.877 km (Phase 1)[2] |
| Character | Underground |
| Operating speed | 80 km/h[2] |
Construction was expected to start in 2019 and complete in 2022.[1]
It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]
List of Stations
| Station Name[2] | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Dongdaqiao | 东大桥 | 6 17 Pinggu | Chaoyang | ||
| Jingguangqiao (Jintaixizhao) | 京广桥 (金台夕照) | 10 Pinggu | |||
| Guanghualu | 光华路 | ||||
| Hexinqu | 核心区 | ||||
| Dawang Lu | 大望路 | 1 14 | |||
| Beijing East railway station | 北京东站 | ||||
| Dajiaoting | 大郊亭 | 7 | |||
| Guangqulu | 广渠路 | ||||
| Guangqudonglu | 广渠东路 | ||||
History
In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[3]
According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[2] The line is upgraded to a subway line, not an automatic people mover (APM).
A feasibility study for the line was approved in October 2020.[4]
Notes
References
- http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html
- "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
- Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.
- www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.