Line 2 (Taiyuan Metro)
The Line 2 of Taiyuan is the first line of Taiyuan metro, as well as the first line in Shanxi. The line opened on December 26, 2020.[1]
| Line 2 | |
|---|---|
| Overview | |
| Status | Operating |
| Service | |
| Type | Rapid Transit |
| System | Taiyuan Metro |
| Daily ridership | 211,000 (2020 Peak)[2] |
| History | |
| Commenced | 2016 |
| Opened | December 26, 2020 |
| Technical | |
| Line length | 23.647[3] km (14.694 mi) |
| Character | Underground |
Stations
Phase 1 of Line 2 extends from Jiancaoping station in the north to Xiqiao station in the south and has 23 stations.[3]
| Phase 1 of Line 2 | |||
|---|---|---|---|
| Name | District | Distance | |
| English | Chinese | ||
| Jiancaoping | 尖草坪站 | Jiancaoping | |
| Jianhe | 涧河站 | ||
| Shenglijie | 胜利街站 | Xinghualing | |
| Dabeimen | 大北门站 | ||
| Jihuying | 缉虎营站 | ||
| Fuxijie | 府西街站 | ||
| Kaihuasijie | 开化寺街站 | Yingze | |
| Dananmen | 大南门站 | ||
| Tiyuguan | 体育馆站 | ||
| Nanneihuan | 南内环站 | ||
| Wangcunnanjie | 王村南街站 | Xiaodian | |
| Changfengjie | 长风街站 | ||
| Xuefujie | 学府街站 | ||
| Nanzhonghuan | 南中环站 | ||
| Jinyangjie | 晋阳街站 | ||
| Longxingjie | 龙兴街站 | ||
| Longchenggongyuan | 龙城公园站 | ||
| Jiajie | 嘉节站 | ||
| Dianzixijie | 电子西街站 | ||
| Kangningjie | 康宁街站 | ||
| Tongdajie | 通达街站 | ||
| Huazhangxijie | 化章西街站 | ||
| Xiqiao | 西桥站 | ||
Construction
Line 2 began construction on March, 2016, as of July 2020, construction of all 23 stations are complete.[4]
In phase 1, it has a total length of 23.647 km, 23 stations,[3] 2 electrical stations and 1 control centre.
References
- "First phase of Taiyuan Subway Line 2 put into operation - Xinhua | English.news.cn". www.xinhuanet.com. Retrieved 2020-12-27.
- 新华网. "太原地铁开通三天 客运量已超51万人次". 新华山西 (in Chinese).
- "23座站点名等公示".
全长23.647公里,设车站23座
- "Taiyuan Gov".
- "地铁2号线将安装各类摄像头3500个".
- "全自动无人驾驶列车运抵太原地铁2号线".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.