Line 3 (Zhengzhou Metro)
Line 3 of Zhengzhou Metro (Chinese: 郑州地铁3号线; pinyin: zhèngzhōu dìtiě sānhào xiàn) is a rapid transit line in Zhengzhou that runs in a northwest - southeast direction. The line uses six car Type A trains.[1] The line opened on December 26, 2020.[2]
| Line 3 | |
|---|---|
| 3 | |
| Overview | |
| Status | Operating |
| Owner | Zhengzhou |
| Locale | Zhengzhou, Henan, China |
| Stations | 21 |
| Service | |
| Type | Rapid transit |
| System | Zhengzhou Metro |
| Operator(s) | Zhengzhou Metro Group Corporation |
| History | |
| Opened | December 26, 2020 |
| Technical | |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
| Electrification | Overhead lines (1500 volts) |
Stations

Map of Zhengzhou Metro Line 3. Including planned extension in future.
| Station name | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Henan Sports Center | 省体育中心 | 4 | Huiji | ||
| Wangzhai | 王砦 | ||||
| Xinglongpu | 兴隆铺 | ||||
| Tongle | 同乐 | 8 | Jinshui | ||
| Nanyangxincun | 南阳新村 | ||||
| Haitansi | 海滩寺 | 5 | |||
| Dashiqiao | 大石桥 | 7 (Planned) | |||
| Renmingongyuan | 人民公园 | Erqi | |||
| Erqiguangchang | 二七广场 | 1 | |||
| Xidajie | 西大街 | Guancheng | |||
| Dongdajie | 东大街 | 2 | |||
| Zhengzhouwenmiao | 郑州文庙 | ||||
| Bolanzhongxin | 博览中心 | 6 (U/C) | |||
| Fenghuangtai | 凤凰台 | Jinshui | |||
| Dongshilipu | 东十里铺 | 4 | |||
| Tongtailu | 通泰路 | ||||
| Xizhou | 西周 | 12 (Planned) | Guancheng | ||
| Dongzhou | 东周 | ||||
| Henan Orthopaedics Hospital | 省骨科医院 | 5 | |||
| Putianxi | 圃田西 | 8 (Planned) | |||
| Yinggang | 营岗 | ||||
References
- "郑州市轨道交通3号线一期工程人防工程防护设备、安装及相关服务采购项目A包、B包、C包、D包招标公告". 2019-03-29. Retrieved 2019-10-23.
- "First-stage of Metro line three, Metro line four in Zhengzhou starts operation - Xinhua | English.news.cn". www.xinhuanet.com. Retrieved 2020-12-28.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.