Line 9 (Hangzhou Metro)
Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a subway line under construction. The line will be 29.45 km (18.30 mi) long and will run in a north-south direction between Guanyintang and Changda Road in Yuhang District in the north.[1]
| Line 9 | |
|---|---|
| 9 | |
| Overview | |
| Status | Under construction Partially operational (under Line 1) |
| Owner | City of Hangzhou |
| Locale | Hangzhou, Zhejiang |
| Termini | Guanyintang Changda Road |
| Stations | 21 (7 in service under Line 1) |
| Service | |
| Type | Rapid transit |
| System | Hangzhou Metro |
| Services | 1 |
| Operator(s) | Hangzhou Metro Corporation |
| Depot(s) | Changda Road Depot
Sibao Stabling Yard |
| Rolling stock | 6 cars, type B |
| History | |
| Planned opening | 2021 |
| Technical | |
| Line length | 29.45 km (18.30 mi) |
| Number of tracks | 2 |
| Character | Underground and Elevated |
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
| Electrification | Overhead, 1,500 V DC |
| Operating speed | 80km/h (50mph) |

Line 9 drawn to scale.
A section of the line, between Coach Center and Linping stations, is currently operational and run as a branch line of Line 1. The other sections of the line are slated to be completed in 2021. The line is colored brown on system maps.
Stations
- Legend
- Operational (as branch line of Line 1)
- Under construction
| Station name | Connections | Location | |
|---|---|---|---|
| English | Chinese | ||
| Guanyintang | 观音塘 | 7 | Jianggan |
| Citizens Park | 市民公园 | ||
| Qianjiang Road | 钱江路 | 2 4 | |
| Fishermen Dock | 渔人码头 | ||
| Sanbao | 三堡 | 6 | |
| Yudao | 御道 | Airport | |
| Wubao | 五堡 | ||
| Liubao | 六堡 | ||
| Qibao Laojie | 七堡老街 | ||
| East Genshan Road | 艮山东路 | ||
| Coach Center | 客运中心 | 1 | Jianggan |
| South Qiaosi | 乔司南 | Yuhang | |
| Qiaosi | 乔司 | ||
| Wengmei | 翁梅 | ||
| Yuhang Railway Station | 余杭高铁站 | Haining Yuhang | |
| Nanyuan | 南苑 | ||
| Linping | 临平 | ||
| Qiushan Dajie | 邱山大街 | Yuhang | |
| Beisha Road | 北沙路 | ||
| Lvzhou Road | 绿洲路 | ||
| Changda Road | 昌达路 | ||
See also
References
- 杭州地铁9号线一期工程今年开工 将深入临平 (in Chinese). Hangzhou News. 16 March 2017. Retrieved 30 August 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.